Distressed asset fit

One architecture. Six mine-plan constraints.

SMART is designed to address the mine-plan constraints that strand otherwise valuable deposits.

01

Top-Down | Earlier Ore

Starts near the top of the orebody, reducing pre-production development and accelerating access to ore.

02

Support | Subsidence Control

Reinforced floors, posts and progressive CRF create a supported system designed to limit ground movement.

03

Small Openings | Water Control

Smaller staged openings enable targeted containment, monitoring and project-specific groundwater isolation.

04

Selectivity | Project Re-Rating

Cell-scale planning and ~500 t blasts can place more mineralization in the mine plan, improve recovery and reduce dilution.

05

Parallel Work | Staged Capital

Mining, structural installation and backfilling can proceed in parallel—supporting earlier cash flow and staged capital deployment.

06

Engineered Cells | Automation

Repeatable geometry, engineered roofs and protected power/fiber support safer tele-remote operation.

Known depositKey constraintsSMART engineeringRe-rated if economic

SMART can re-rate a mineral asset: more mineralization enters the mine plan, more planned ore is recovered and less waste reaches the mill. Cleaner feed can reduce haulage, energy, consumables, equipment wear and dry-stack tailings per unit of metal produced.